Tuesday, September 17, 2013

Tips For Exterior Painting Smyrna GA

By Dawn Williams


Painting is a crucial way part of maintaining a building, whether residential or commercial. It usually carried out for various reasons such as replacing the old paint or making decorations. However, the general notion holds that exterior painting majorly restores and improves the quality of the house. It is a daunting task that incorporates a wide range of processes. When carrying out exterior painting Smyrna GA experts guide their clients on what it all involves.

The first step involved in painting is choosing relevant equipments and resources for the job. Proper planning means that the project owner should make swift moves towards making minimum investments of the materials. Adequate preparations also include making a proper budget for all the pending costs of the entire project. All tools and materials to be used for the project should be put in [place before any task commences.

Most paint jobs are usually carried out using a paint brush. This follows that buying a high quality brush must be part of making preparations. Preferably, most painters use straight-bristled brushes for large scale paint work and sash angled ones for more detailed painting. Large scale exterior jobs often requires the use of painting rollers, especially when one wants to paint bricks, stucco or shingles. The most commonly used rollers are, standard rollers used for flat areas and a 7-inch roller used to paint narrow parts.

The painter should be careful not to waste much paint while loading the brush. The brush is loaded by dipping about 2 inches of the bristles into the paint. It is then slapped back and forth against the side of the can to reduce the excess paint. This requires using just 2 or 3 inches of paint instead of a full can.

Quality paint is restored by ensuring that colors used conform to the architectural requirements of the building. The property owner can often seek the intervention of professional painters and contractors to assist them in choosing appropriate colors. First, the painter should test the entire color scheme on a small part before applying the whole paint. A rough measurement of the exterior building should be made in order to determine adequate amount of paint for use.

Using a roller involves hanging the roller screen into the bucket as paint is loaded. The screen is used to roll around the roller nap in order to ensure that it absorbs adequate amount of paint. It also eliminates excess paint absorbed by the roller nap.

Exterior paint jobs are adversely affected by poor weather conditions. Too much heat and direct sunlight can dry up the paint before being absorbed by the surface. Blowing wind also speeds up the drying process as soon as the paint is applied. Low temperatures can often affect the process, especially when latex paint is used.

Quality can be effectively sustained through avoiding some of the common problems that affect the activity. Brush marks should be avoided through making new brush strokes in an unfinished region or at the edge. Lap marks can be eliminated trough adding another coat before the previous one dries up. Nevertheless, in order to get a good company in exterior painting Smyrna GA residents can get one over the Internet.




About the Author:



No comments:

Post a Comment